File #: PUB16-263    Version: 1 Name:
Type: Public Utilities Board
File created: 12/19/2016 In control: Public Utilities Board
On agenda: 2/13/2017 Final action:
Title: Consider a recommendation for Weaver Consultants Group (WCG), Ft. Worth, Texas, to provide professional design, engineering, and emergency construction services for the installation of an expansion of the existing soil vapor extraction system, the odor control system, to provide operational training of the systems, and provide an air permit update and permit modification for these system expansions to the Texas Commission of Environmental Quality (TCEQ) for the projected amount of $272,225, (File #6330).
Attachments: 1. Exhibit 1 - Weaver Consulting Group proposal, 2. Exhibit 2 - Declaration of an Emergency
Date Ver.Action ByActionResultAction DetailsVideo
No records to display.
Agenda Information Sheet

DEPARTMENT: Solid Waste & Recycling

CM/ ACM: Jon Fortune

Date: February 13, 2017

SUBJECT
Title
Consider a recommendation for Weaver Consultants Group (WCG), Ft. Worth, Texas, to provide professional design, engineering, and emergency construction services for the installation of an expansion of the existing soil vapor extraction system, the odor control system, to provide operational training of the systems, and provide an air permit update and permit modification for these system expansions to the Texas Commission of Environmental Quality (TCEQ) for the projected amount of $272,225, (File #6330).
Body
BACKGROUND

We have recently encountered an exceedance in the level of methane gas at two of our perimeter monitoring wells. The gas levels are significantly higher than our permitted limits and require immediate corrective action to protect the public health and safety. We have initiated an emergency purchase process in accordance with the Texas Government Code 252.022(a)(2) which authorizes emergency purchase authority to protect the public health and safety. This authorization will provide for the expansion of our gas and odor control system, as described in the attached exhibit, to meet permit and regulatory requirements. The gas extraction wells have been installed and the gas levels have returned to zero.

The Declaration of Emergency (Exhibit 2) was prepared prior to the Weaver Consulting Group contract being drafted. The document does not reflect the costs associated with Payment and Performance Bonds, which are statutorily required as part of the project cost proposal, and included as a project cost component. The Payment and Performance bonds for the project total $7,285, placing the project total at $272,225.


RECOMMENDATION

The Solid Waste & Recycling Services Department requests the Public Utilities Board (PUB) acknowledgment that the emergency purchase was handled by Weaver Consultants Group, Ft. Worth, Texas, in ac...