Title: Consider adoption of an ordinance of the City of Denton, Texas, authorizing the City Manager to execute a Professional Services Agreement with Teague Nall and Perkins, Inc. for Engineering Services related to the Magnolia Drainage Phase II project; and establishing an effective date (File 6405 in the not-to-exceed amount of $118,000).
Attachments: 1. Exhibit 1-Staff Memo, 2. Exhibit 2-Ordinance, 3. Exhibit 3-Contract
Date Ver.Action ByActionResultAction DetailsVideo
No records to display.
AGENDA INFORMATION SHEET


DEPARTMENT: Materials Management

DCM: Bryan Langley

AGENDA DATE: March 21, 2017

SUBJECT
Title
Consider adoption of an ordinance of the City of Denton, Texas, authorizing the City Manager to execute a Professional Services Agreement with Teague Nall and Perkins, Inc. for Engineering Services related to the Magnolia Drainage Phase II project; and establishing an effective date (File 6405 in the not-to-exceed amount of $118,000).
Body
FILE INFORMATION

The Magnolia Drainage project was conceived in order to improve storm water drainage conditions and prevent flooding in Hinkle Drive and in the adjacent neighborhoods between West Windsor Drive to the north and University Drive to the south.

Phase I of the project consisted of the design and construction of a storm water detention basin north of West Windsor Drive between Windsor and North Elm Street. Construction documents created by City of Denton staff for the storm water detention basin were issued in 2010, and construction of the basin was completed in 2012.

Phase II of the project consists of design of storm drain improvements to address flooding in portions of the Headlee Addition, bounded on the north by Windsor Drive, on the east by Mesquite Street, on the south by Headlee Street and on the west by Hinkle Drive. The proposed storm drain will extend from the existing channel at Windsor Drive (between Hinkle and Mesquite) to North Pecan Creek at Hinkle Drive. In addition, the plans will show abandonment of the existing 10" waste water line in Hinkle Drive and connection of services to the existing 18" waste water line.

Teague Nall and Perkins, Inc. has been selected for the detailed design of this project on the basis of demonstrated qualifications in drainage and roadway design. Teague Nall and Perkins, Inc. has worked closely with staff to scope and execute other similar projects. They have performed well in the execution of professional engineering services for the Ci...