File #: ID 17-198    Version: 1 Name:
Type: Ordinance
File created: 2/5/2017 In control: City Council
On agenda: 3/21/2017 Final action:
Title: Consider adoption of an ordinance accepting competitive proposals and awarding a contract for the purchase of high density polyethylene pipe for the City of Denton Landfill; providing for the expenditure of funds therefor; and providing an effective date (RFP 6236-awarded to Scheele Engineering Corporation in the three (3) year not-to-exceed amount of $780,000). The Public Utilities Board recommends approval (5-0).
Attachments: 1. Exhibit 1-Evaluation and Ranking Sheet, 2. Exhibit 2-PUB Minutes, 3. Exhibit 3-Ordinance, 4. Exhibit 4-Contract
Date Ver.Action ByActionResultAction DetailsVideo
No records to display.
AGENDA INFORMATION SHEET


DEPARTMENT: Materials Management

ACM: Bryan Langley

AGENDA DATE: March 21, 2017

SUBJECT
Title
Consider adoption of an ordinance accepting competitive proposals and awarding a contract for the purchase of high density polyethylene pipe for the City of Denton Landfill; providing for the expenditure of funds therefor; and providing an effective date (RFP 6236-awarded to Scheele Engineering Corporation in the three (3) year not-to-exceed amount of $780,000). The Public Utilities Board recommends approval (5-0).
Body
RFP INFORMATION

The City's Solid Waste Department performs anaerobic leachate recirculation at the City's landfill. This technology requires the application of liquid nutrients to the municipal solid waste that is placed within the landfill, in order to enhance microbic activity and waste decomposition within the waste pack. Liquid nutrients are introduced into the waste pack through a High Density Polyethylene Pipe (HDPE) piping system, which is installed within the waste pack as each waste cell is filled. The piping system allows for the controlled application of liquid nutrients throughout the waste cell, which then accelerates the landfill waste decomposition process, and the generation of methane gas.

In 2008, the City's Solid Waste Department installed a landfill gas collection system to collect and use the methane gas as a green energy source. HDPE piping is used to collect and direct the gas to the electric power generator which is tied into the Denton Municipal Utilities power grid. The landfill gas collection system and the electric power generation station were designed for expansion as the methane gas production increases.

Liquid nutrients and landfill gas piping (HDPE) and piping accessories, are generally purchased one to two times per year, and routinely installed throughout the fiscal year as the landfill receives waste.

Request for Proposals were sent to 110 prospective suppliers, including ...