File #: MC17-010    Version: 1 Name:
Type: Mobility Committee
File created: 3/16/2017 In control: Mobility Committee
On agenda: 3/21/2017 Final action:
Title: Receive a report, hold a discussion, and provide direction regarding Oak Phase III-A bike accommodations, from Carroll Boulevard to Bonnie Brae.
Date Ver.Action ByActionResultAction DetailsVideo
No records to display.
Agenda Information Sheet

DEPARTMENT: Transportation

CM/ ACM: Bryan Langley

Date: March 21, 2017

SUBJECT
Title
Receive a report, hold a discussion, and provide direction regarding Oak Phase III-A bike accommodations, from Carroll Boulevard to Bonnie Brae.
Body

BACKGROUND
In FY 2014-2015, $220,000 was allocated from the Bike Fund for bike accommodations on Oak and Hickory Streets. The project was divided into three phases to better accommodate projects that were ready and those waiting on utility or other street work. Phases I and II, which consisted of bikes lanes and sharrows on Oak and Hickory from Bell Street to Carroll Boulevard, were completed in August 2016.

Phase III, which is Oak and Hickory from Carroll Blvd to Bonnie Brae Street, was further separated into phases to account for the planned utility and street work on Hickory St. Hickory Interim included a restripe of the existing bike lane from Welch Street to Carroll Blvd. and a restripe of the intersection to provide continuity of bike lane through the intersection. Since Oak St. will not be reconstructed with Hickory St., Oak Phase III-A moves forward with bike accommodations from Carroll Blvd to Ave C/Jagoe, where a bike lane exists currently eastward to Bonnie Brae St.

Oak St from Carroll to Ave C/Jagoe presents several challenges. The roadway width is not consistent throughout, ranging from 32 feet to 34 feet. The street is also a key bus route for Denton County Transportation Authority, with plans to increase headways to 15 minute intervals. Also, where parking is available, it has a high-turnover.
Based off discussion and recommendations from the previous Mobility Committee meeting, staff is presenting a new configuration for bike accommodations. Staff proposes narrowing parking to eight foot for the entire section. The 34' section will have a ten foot and ten a half foot travel lanes, along with a five and a half foot bike lane. The 32' section, which has parking for a small segme...

Click here for full text